Studio capacity Two build slots open from November, and one strategy sprint in late October. Check a date for your project
Wide view of a quiet studio workspace with long desks, plants and daylight through tall windows

Strategy · Design · Build

A small studio that plans the work, then actually ships it

River Orbit works with a handful of teams at a time. You get the same two people from the first conversation through to launch week — no handover to a delivery pod you have never met.

Positioning

Message testing, audience mapping and the narrative your site has to carry.

Web design

Editorial layout systems, type scales and components your team can extend.

Front-end build

Hand-written, fast, accessible pages wired into the content system you already pay for.

Launch support

Content loading, redirects, analytics events and a month of post-launch fixes.

How we work

Three ways to start, priced as one scope

Most enquiries arrive as “we need a new website”. Often the real job is smaller than that, or it is a positioning problem wearing a design brief. Pick the lane that sounds closest and we will confirm or correct it in the first call.

Lane 01

Positioning sprint

A short, focused engagement to settle what you sell, to whom, and in what order the story lands. Ends with a written narrative, a page-by-page message map and the copy spine your team or ours can build against.

Best for
Teams rewriting the site themselves
Runs for
Two to three weeks
You receive
Narrative, message map, copy spine
Lane 02

Site design and build

The full engagement: positioning, a design system sized to your real content, then a hand-built front end. We write the markup ourselves, so pages stay quick, keyboard-friendly and straightforward for your team to edit after we leave.

Best for
Replacing a site you have outgrown
Runs for
Six to ten weeks
You receive
Design system, built pages, content wiring, handover
Lane 03

Retained studio time

A standing block of studio days each month for campaign pages, product launches and the design debt that never quite reaches a roadmap. Unused days roll over once, so a quiet month is not a wasted one.

Best for
In-house teams needing overflow capacity
Runs for
Rolling, month to month
You receive
Booked days, shared backlog, monthly review

Recent work

Three projects, described plainly

Short notes on what the brief was, what we changed, and what the team walked away with. Client names stay private until each project is publicly live.

Laptop screen showing a reporting dashboard with charts and data tables
Analytics platform

A pricing page that stopped hiding the product

Three plans, eleven feature rows and no sense of who each tier was for. The sales team was answering the same two questions on every call.

  • Rewrote the tiers around team size, not feature counts
  • Built a comparison view that still reads on a phone
Planning workshop table covered in sticky notes and notebooks with two people working
Specialist consultancy

One story instead of four service pages

Four partners, four ways of describing the same practice. We ran a positioning sprint before anyone opened a design file.

  • Agreed a single narrative across two workshops
  • Reduced twenty-six pages down to nine
Designer working at a desktop computer on page layouts in a bright studio
Independent publisher

A layout system their editors can drive

Every new article needed a developer. The editorial team wanted to publish on a Friday afternoon without filing a ticket.

  • Nine reusable blocks with clear editing rules
  • Handover notes written for editors, not engineers

Process

Four stages, in this order, every time

You will always know which stage we are in and what is needed from you next. Nothing moves forward on a maybe.

  1. 01

    Read the situation

    A working session on goals, constraints and what has already been tried. We write back a one-page scope with what is in and what is deliberately out.

  2. 02

    Settle the story

    Message map, page order and the words that carry the argument. Design waits until this is agreed, because redrawing is cheaper than rewriting.

  3. 03

    Design and build together

    Layouts go straight to code in short review loops. You see real pages in a browser each week rather than static mock-ups.

  4. 04

    Launch and hand over

    Content loading, redirect checks, analytics events, then a recorded walkthrough and written notes for whoever maintains the site.

Working together

How a week runs, and what we need from you

Projects stall for predictable reasons: unclear decisions, missing content, too many opinions in one room. Here is how we keep that from happening.

A typical studio week

  1. Monday. Written update in your channel: what shipped, what is next, anything blocked.
  2. Midweek. A 45-minute review on a live staging link. Cameras optional, decisions not.
  3. Thursday. Build and revision time, kept clear of meetings.
  4. Friday. Staging is updated and next week’s questions are posted before we log off.

What we ask of you

  • One decision maker. Gather opinions however you like, then send us a single answer.
  • Content owners named early. Copy and images are the usual delay, rarely the design.
  • Access on day one. Content system, repository, analytics and brand files, so week one is not spent waiting.
  • Feedback in one pass. Consolidated notes per review beat a drip of messages.

Questions

Before you send a brief

How should we think about budget?

Tell us the range you have rather than asking us to guess it. We shape scope to a number instead of quoting a number for a fixed scope, so a smaller budget usually means fewer pages done properly rather than the same site done thinly. If the range cannot support the outcome you need, we will say so on the first call.

Do you work alongside our in-house team?

Often, yes — retained studio time exists for exactly that. We agree which files, branches and decisions belong to whom before starting, and we write in whatever conventions your developers already use so nothing needs unpicking later.

What happens if the scope changes mid-project?

We note it, price it as a separate line, and let you decide whether it displaces something already scoped or extends the timeline. Changes are normal; quietly absorbing them until the project runs late is not.

Which platforms do you build on?

We prefer to build the front end by hand and connect it to whichever content system your team can maintain. If you are already invested in a platform, we work inside it. If you are starting fresh, we recommend the simplest option that matches how often you actually publish.

How long until we see something real?

A live staging link usually appears in the second or third week, depending on the lane. You will see pages in a browser well before final sign-off, because that is where layout problems actually reveal themselves.

What does handover include?

A recorded walkthrough, written editing notes for non-technical staff, the component rules, and a month of fixes for anything behaving differently from what we agreed. Ongoing work after that is optional, never assumed.

Start a brief

Tell us what you are trying to fix

A few sentences is plenty. We read every enquiry ourselves and reply with either a suggested lane and a next step, or an honest note that we are not the right studio for it.

Prefer to think out loud first? Send the same form with “just exploring” in the brief and we will keep it to one short conversation.

Add a link to your current site if there is one.